Compact DC fast charging

DC Fast Charger30–80 kW

DC charging for commercial stops and fleet top-ups. Compare the power tier with the site’s spare capacity, vehicle mix and expected use of each bay.

View specifications
Equipment format
Integrated charging cabinet
Selection focus
Service capacity & power allocation
EQUIPMENT REFERENCE
Floor-standing DC charging cabinet with display, access reader and cable
Product format reference. Cabinet output, connector and available features are confirmed for the model quoted.

Application fit

Built into the right operating plan.

Retail · Dealerships · Fleet top-ups. Selection depends on the site’s electrical conditions and the actual vehicle-use pattern.

01

Right-size the power tier

Compare 30, 40, 60 and 80 kW options with the vehicle charging curve and the site connection.

02

Understand shared output

On multi-gun models, confirm how total cabinet power is allocated when vehicles charge together.

03

Coordinate the whole bay

Review the foundation, feeder, disconnect, cable reach and protection as one installation scope.

Technical selection

Know what you are specifying.

These are configuration references. The current model datasheet and written scope determine the equipment supplied.

Swipe to view the full specification table →

ParameterSelection referenceConfirm for your project
Rated output range30 / 40 / 60 / 80 kW referencesSelect the exact model against service capacity and operating demand.
Input service480 V three-phase reference for U.S. planningConfirm the actual input rating, frequency, current and protection in the model datasheet.
DC outputVoltage window and maximum current: model-specificMatch the vehicle platforms and accepted DC charging profile.
Connector & portsSingle- or dual-gun configurationsConfirm connector type, port count and supported vehicle compatibility.
Power allocationStatic or dynamic modes: confirm per modelTotal cabinet power is shared; two guns do not imply two full-rated outputs.
Backend & meteringOCPP and metering options: confirm per modelReview network version, billing needs and platform compatibility.
Enclosure & coolingOutdoor/cooling ratings: model-specificReview ambient temperature, ventilation and installation clearances.
Order evidenceDatasheet, safety documents, commissioning guide and warrantyConfirm the supplied hardware, software and documentation package.

Project inputs

Three checks before selection.

Use the project’s actual conditions to define a compatible configuration with your installer or engineer.

01

Electrical headroom

Existing transformer, available service and other simultaneous site loads.

02

Vehicle mix

Required DC voltage/current range and the vehicles’ accepted charging curves.

03

Bay operation

Expected dwell time, simultaneous charging, cable routing and backend requirements.

Quality & production evidence

Quality should be traceable.

Review the evidence for the proposed equipment, from assembly and routine testing to the documents supplied with the order.

01

Parameters that match

Confirm model identity, rated input/output, connector, enclosure, cable limits and protection against the current datasheet.

02

Factory & functional records

Agree which assembly, routine electrical, protection and functional test records are available for the selected model.

03

Documents that apply

Review applicable safety/listing evidence and backend compatibility for the exact hardware, firmware and destination.

04

A defined delivery package

Confirm serial identification, manuals, accessories, commissioning information, packing records and warranty terms.

Certification logos or a product photograph are not a substitute for model-specific documentation. Requested records and test scope are confirmed in the written quotation.

Production & supply scope

Define the package.
Keep it accountable.

The hardware, accessories and supporting records should describe the same selected configuration.

Our service & quality approach ↗
  1. 01

    Before production or allocation

    Confirm model, power tier, connector, quantities, site interfaces and the requested document list.

  2. 02

    Before dispatch

    Review the agreed test records, identification, accessories, packing information and delivery terms.

  3. 03

    For commissioning & operation

    Confirm installation and operating manuals, backend access where included, maintenance information, warranty and support arrangements.

Practical answers

Before you specify.

Resolve the details that affect compatibility, operation and the final supply scope.

Does a dual-gun charger provide full power to both vehicles?

Do not assume it does. Total cabinet output is allocated across the guns. Confirm the model’s allocation logic and per-port limits.

Can it use an existing 480 V service?

Voltage alone is insufficient. The installer or engineer must review spare capacity, feeder and protection against the selected model’s input requirements.

How long will a vehicle take to charge?

Charging time depends on the vehicle, battery state, temperature, accepted charging curve and shared output. It cannot be guaranteed from the charger’s headline rating.

Can a battery buffer help a constrained connection?

It may be worth comparing, subject to a site-specific energy, controls and cost review. Storage does not remove the need to assess the complete electrical design.

Which accessories and documents are included?

Confirm the guns, cables, holders, mounting/foundation guidance, commissioning access, safety documents and warranty in the order scope.

EXPLORE FURTHER

Compare equipment & technical guides.

Scroll to Top